Conservation Agendas 2010-12-07
Orleans Conservation Commission                                 

Hearing/Work Meeting    Nauset Room             December 7, 2010
8:30 a.m.       Call to Order   

Notice of Intent
Continuations
Continued from 9/21/2010 (JBr1, AP1, JBa1), 10/5/10
Patrick & Janet Regan                                    21 Tanglewood Terrace
by Ryder &Wilcox, Inc. and Assessor’s Map 20, Parcel 82,. The proposed removal of invasive plants and planting of native plants. Work will occur on and within the buffer to a Coastal Bank.  The applicant requests that this hearing be continued to December 14, 2010.

Continued from 10/19/2010, 11/16/2010
Robert & Sally Roda (AH1)                                       187 Namequoit Road
by Coastal Engineering Co, Inc.. The proposed installation of a rock revetment and beach nourishment  to a Coastal Bank.  Work will occur on a Coastal Bank, Coastal Beach, and within 100’ of the Top of a Coastal Bank. A new plan has been submitted.  

Continued from 11/2/2010, 11/16/2010
Patrick Dwyer                                            27 Standish Road
by Ryder & Wilcox, Inc. The proposed removal of an existing dwelling and the construction of a new single-family dwelling.  Work will occur within 100’ of Land Subject to Coastal Storm Flowage, a Coastal Bank, and a Coastal Dune.  Construction access to the site will be within Land Subject to Coastal Storm Flowage.   A new plan has been submitted.  

Certificates of Compliance
Last heard 10/5/10 and site visit Commission said they could substitute shrubs.
Ross Bierkan (Mc Crossan)2006                           20 Bufflehead Lane
COC request for an Order to remove and rebuild a dwelling. The dwelling was built as shown on the site plan with the addition of 3 AC units on the north side of the dwelling. The 7 trees proposed to be planted in the old driveway were not planted; this area is now an extension of the lawn.

Last Heard 11/23/10 (BR1, SP1, JO1)
Terri & Fred Clark                                              14 Pride’s Path
COC request for an Order for the construction of the breezeway, garage addition, and driveway and Septic System alterations.  None of the proposed mitigation work was completed.  The applicant will re-file for the remaining work to be done under a new Notice of Intent.  

Mark & Susan Adorney (2/28/2006)                        47 Twiss Road
COC Request for an Order for the removal of an existing dwelling, construction of a new dwelling, installation of a new septic system, construction and grading of a driveway, and an approved landscaping plan.  Two AC units were installed off of the southwest end of the dwelling, a generator was installed off the northside connector between the garage and the dwelling, and an underground propane tank was installed off of the north side of the building.  An as-built plan has not been submitted to reflect these changes.  

Mark & Susan Adorney (12/5/2006)                        47 Twiss Road
COC request for an Order to remove a timber bulkhead and install gabion toe protection to stabilize an existing eroding bank.

IJM Trust                                                       315 South Orleans Road
COC request for an Order to install a Title V septic system.  The system was installed in 1994 and received a Certificate of Compliance with the Health Department.

Last Heard September 14, 2010 (AH1, AP1, JB1)
William & Nancy Brotherton (2007)                       17 Blue Rock Road.  
COC request for an Order to remodel and add an addition to an existing house including a new foundation, additional driveway construction, and the installation of a water service. A revised plan was submitted and approved by the Commission on 10/19/10.  A planting plan has been submitted and approved showing only native plantings and areas on the bank and slope to be revegetated.

William & Nancy Brotherton (Amended)                    17 Blue Rock Road
COC request for an Order to remodel and add an addition to an existing house that was amended to upgrade the septic system. A revised plan was submitted and approved by the Commission 10/19/10.  

Mark Picton     (2/14/95) (JB1) (JO1)                   22-24 Priscilla Lane
COC request for an Order for additions to an existing dwellings and a new septic system.  An As-Built Plan has been submitted reflecting the following changes:  The driveway has a different configuration. One of the decks on Dwelling B is smaller. The additions to Dwelling A were not built other than a foundation off the west side. The deck on the northwest corner of Dwelling B was not built. The area around the wetlands was allowed to naturalize.  The pipe emptying into the wetland and the rubble within the wetland have both been removed as per the request of the Commission from the 11/3/09 hearing.  Two drywells have been installed to handle the roof runoff and foundation draining as part of a newly issued Order, DEP# SE 54-2054.  The remaining work being performed on the site falls under the newly issued Order.  

Mark Picton     (11/3/97) (JB1) (JO1)                                           22-24 Priscilla Lane
COC request for an Amended Order which reconfigured the footprint of the structures and the parking areas.  

Administrative Review
Tom & Mary Heiser                                               27 Carlton Road
The proposed construction of a screened porch and the rebuild of an existing deck in the existing footprint.  The porch will be constructed on hand dug sono tube footings.   Work to occur within 100’ of the Top of a Coastal Bank.  

Jay Hadinbuckel                                         Nauset Beach Camp #4
The proposed residing of the camp with cedar shingles.  Work will occur within 100’ of the top of a Coastal Bank, Coastal Dune, Barrier Beach, and Land Subject to Coastal Storm Flowage.  Work to be done by Kurt Martin.

Bill Sargent                                                    63 Old Field Road
The proposed construction of an additional 70 feet of gabions to protect the toe of the marsh.  This would be a continuation of gabions located East of the marsh.  Work will occur within Coastal Beach, Salt Marsh, Land Subject to Coastal Storm Flowage, and Coastal Bank.

Sara Corcoran                                           111 Freeman Lane
The proposed mowing around the fruit trees and mowing a path to maintain the honey beehive.  Work will occur within 100’ of a Freshwater Wetland.

McLennen Trust                                          661 S. Orleans Road
The proposed removal of dead and dangerous trees.  Work will occur within 100’ of the top of a Coastal Bank.  Work to be done by Miranda’s Landscaping.

Town of Orleans                                         Across from Franz Road
The proposed removal of 1 oak shrub within the 50’ buffer zone.  The oak shrub will be replaced with one 3-4’ tall beach plum;  Dan Connolly has been consulted.  Work to be done by Wilkinson Ecological.

Dave Winnick                                            10 Windy Hill Road
The proposed installation of a natural gas generator on the back left side of the house.  Work will occur within 100’ of Edge of Wetland.  Work to be done by Mark Kiefer.

Request for Extension
Joy Fopiano                                                     16 Honeysuckle Lane
Request for a 1 year extension to complete the work under the Order.  Work is by East Cape Engineering.

Jill Fopiano                                                    12 Honeysuckle Lane
Request for a 1 year extension to complete the work under the Order.  Work is by East Cape Engineering.

Request to Use Conservation Property
Windmill                                Wedding                 6/18/11
Matt Condon & Allyson Vallone   30 People                       3-6pm


Windmill                                Wedding                 9/24/11
Phoenix Kovacs & Donald Vinci   180 People                      4-6pm

Kent’s Point                            Educational Walk                12/11/10
Kris Ramsey & Bob Prescott      10-25 People                    10am-12pm  

Chairman’s Business
Approval of the Minutes from the Work Meeting on November 23, 2010.

Other Member’s Business

Administrator’s Business

Site Visit
Continued from 9/21/2010 (JBr1, AP1, JBa1), 10/5/10
Patrick & Janet Regan                                    21 Tanglewood Terrace
by Ryder &Wilcox, Inc. and Assessor’s Map 20, Parcel 82,. The proposed removal of invasive plants and planting of native plants. Work will occur on and within the buffer to a Coastal Bank.